Debrief.
Conference series Zak World of Façades Editions, speakers and registration
Follow

Shawn Duffy used One North Quay and the transformation of 8 Canada Square to argue that higher building performance now depends on interactions between structure, façade, services, vertical transport and spatial planning.

Laboratory space is part of the architecture
Services shape the workplace. One North Quay treats research floors, communal areas and technical infrastructure as one planning problem rather than stacking independent systems.

Shawn Duffy argued that many individual building technologies are approaching a point of diminishing returns. Better glass coatings, lower-carbon concrete, smarter lifts and more efficient plant still matter, but the largest remaining gains increasingly come from changing the relationships between systems. Using One North Quay and the proposed transformation of 8 Canada Square, he showed how structure, façade, services, vertical transport and spatial planning can be adjusted together so one move solves several problems at once.

One North Quay began with constraints, not form

The Canary Wharf site was hemmed in by the DLR, a listed dock wall, a ramp and utility tunnel, a nitrogen yard and a roughly four-metre level difference. A laboratory brief added strict vibration and servicing requirements. Rather than treating those conditions as separate engineering problems, the design team used them to shape the structural grid and building organisation from the outset. The architectural idea was a series of laboratory neighbourhoods arranged along communal space, with all-electric plant distributed across several floors rather than concentrated in one conventional roof zone. That choice supported specialist lab and maker spaces while allowing the plant strategy to participate in the planning logic.

Moving columns improved more than structure

The team started from a regular 7.2-metre laboratory grid. By pulling perimeter columns on the east and west inward, a roughly 2.5-metre cantilever created a backspan that increased floor stiffness. Duffy said that allowed slab thickness to reduce by about 25 mm and removed an entire row of columns along the building. The relocated columns also landed inside a foundation wall that helped shield the structure from vibration generated by the DLR. One structural adjustment therefore improved lab vibration performance, reduced material and simplified foundations while changing the façade edge condition at the same time.

A flexible lab edge stays open to daylight
Structure buys planning freedom. A more efficient grid supports adaptable laboratory and workplace layouts while keeping the perimeter available for light and views.

Big concept moves delivered the first carbon reduction

An early feasibility study put structural embodied carbon at roughly 450 kgCO₂e/m². Duffy said the major Stage 2 moves, structural reconfiguration, architectural planning and redistributed plant, brought that to about 325 kgCO₂e/m² within roughly three months of concept design. Later material refinements, including recycled aggregate, alternative fuels and reclaimed steel, then closed the remaining gap to the target. The sequence matters. Incremental material innovation was valuable, but it worked after the geometry and systems had already removed a much larger share of demand. Optimising a fundamentally inefficient arrangement would have left less room for the same result.

The façade expresses the structural bay
Envelope and frame align. The external grid reflects planning and structural decisions made for laboratories rather than being applied as an independent visual layer.

8 Canada Square uses subtraction to add value

The second example applied systems thinking to an existing Canary Wharf tower. Instead of asking how to refurbish every element in place, KPF’s competition approach began by removing selected floor area to change the building’s commercial and spatial performance. Concentrating subtraction around the lift zones created new relationships between floors and helped transform the identity of a tower originally designed for a very different office market. Duffy described a ripple effect: one decision about net internal area opened possibilities for circulation, amenity, massing and façade change. The project is still subject to detailed testing, but the concept demonstrates why adaptive reuse can require more than component replacement.

8 Canada Square is treated as a system to reconfigure
Subtraction creates a new type. Strategic removal can unlock daylight, amenity and identity in an existing tower without discarding the whole structural asset.

Systems thinking changes where innovation happens

The lesson across both projects is not to stop improving components. It is to ask first whether a change in one discipline can reduce demand in several others. A structural grid can help vibration and embodied carbon; a plant strategy can support planning; a deliberate subtraction can improve circulation and façade expression at once. That moves innovation earlier, when geometry and programme are still negotiable. Once the building is fixed, teams are left chasing smaller gains inside each package. When systems are designed together, performance becomes an architectural outcome rather than a collection of product upgrades.

Duffy’s examples also recast the façade as an output of broader decisions. At One North Quay, the perimeter is affected by the lab grid, vibration strategy and plant distribution; at 8 Canada Square, façade change follows the removal and reorganisation of internal floor area. In both cases, asking the envelope team to optimise a fixed elevation would miss the larger opportunity. Systems thinking changes the brief before the façade is detailed.

Site constraints become design inputs
Constraints shape the model. Transport, utilities, heritage fabric and servicing zones are mapped together so the building can respond with coordinated moves instead of local fixes.
Synthesis based on the presentation by Shawn Duffy (KPF) at Zak World of Façades London, 5 November 2025. Watch the full recording via the link above.